ERE Holding Headquarters

Sucati Dam and HEPP, Technical Information

Energy

Telecom

Defense

Air Traffic Control

Construction

 

Turkce

ERE Home

Quality Policy

About ERE

ERE Companies

 

Sucati

Sucati

Sucati

Sucati


SUCATI DAM and HEPP
GENERAL TECHNICAL INFORMATION

GENEL

Place

Kahramanmaras town

Location

Sucati Village

DAM BODY

Type

RCC (Roller Compacted Concrete)

Height

36 m

Crest Length

191 m

Penstock Diameter

2 x3.00 m

POWER HOUSE

Power House Protection &Control

SIEMENS Austria

Turbine Manufacturer

VOEST MCA Austria

Type

Kaplan S

Net Head

34.85 m

Installed Power

2 x 3.5 MW

Generator Manufacturer

ELIN Austria

DAM LAKE

Lake Area

1,100,000 m2

Lake Volume

11,340,000 m3

Re-location Road

3 km

OPERATION

Construction Period

20 months

Opearation Period

15 years

Annual Firm Energy Production

7.96 GWh/year

Annual Secondary Energy Production

20.08 GWh/year

Annual Total Energy Production

28.04 GWh/year



Our Energy References:

Publications

Telecom:

ERE/ESER Telekom

Defense:

Air Traffic

Construction: