ERE Holding Merkez Binaları

DAGPAZARI Project, November - December 2003

Enerji

Telekom

Savunma Sanayii

Hava Trafik Kontrol

İnşaat

 

English

Ana sayfa

Kalite Politikamız

Kısaca ERE

Şirketlerimiz

 

Suçatı

Suçatı

Suçatı

Suçatı

    Penstock General Layout

    Sogutozu Weir

    Dagpazari Weir

    Settling Basin, Maiden Filling

    Pelton Turbine, 5 Injectors and Runner Pit

    Generator Erection

    Cooling Water System, Piping Works

    Generator Bus-Duct and AC-DC & Auxiliary System Cubicles

    Control Room, Control Cubicles

    Switchyard and Powerhouse, General Layout

    Generator Rotor Transportation (60 tonnes)

    Unloading the Rotor at Powerhouse

    Rotor (poles not installed yet)

    Lifting the Rotor

    Rotor Lifted

    Rotor in Erection Pedestal

 